Taking a break from rubbing down and priming, after 4 coats of primer and rubbing down I needed a change so I have fabricated the passenger side of the transmission tunnel and floor, quite a challenge too as there seems to be not a single 90 deg corner to start from. I am fabricating the tunnel from 1.5mm Aluminuim and floor from 3mm Aluminium rather than the old 10mm ply board, as the replacement gearbox is so much larger than the Marina unit most of the fabrication is a new shape and nothing could be used as a template, hopefully I will finish the floor etc by Friday.